Hydromix Logo PLANT PRODUCTIVITY
--With--
THE PATENTED HYDROMIX METHOD OF SLURRY MIXING
& BATCHING
 
BASED ON:   10 YARD LOADS
TYPICAL MIX DESIGN:   (.35 WATER / CEMENT RATIO )

500# CEMENT AND FLYASH
176# WATER (21 GAL.)
3324# AGGREGATE


PRE-LOAD BATCH AND TRUCK POSITIONING TIME:
30 SEC 45 SEC 60 SEC
 
PLUS
HYDROMIX LOAD TIME:
(CEMENT AND WATER)
 
 
10 SEC YARDS
50# CEM/SEC
332# AGG/SEC
126 GPM
SEC/LOAD
YDS/HR
130 145 160
277 248 225
 
12 SEC YARDS
42# CEM/SEC
277# AGG/SEC
105 GPM
SEC/LOAD
YDS/HR
150 165 180
240 218 200
 
14 SEC YARDS
36# CEM/SEC
237# AGG/SEC
90 GPM
SEC/LOAD
YDS/HR
170 185 200
212 195 180
 
16 SEC YARDS
31# CEM/SEC
208# AGG/SEC
79 GPM
SEC/LOAD
YDS/HR
190 215 220
189 167 164
 
18 SEC YARDS
28# CEM/SEC
185# AGG/SEC
70 GPM
SEC/LOAD
YDS/HR
210 225 240
171 160 150

NOTES:
 
  1. This chart was developed to emphasize the importance of all aspects of plant production: pre-loading the batch, truck positioning, Hydromix slurry time, and aggregate feed rate.

  2. Hydromix load time will depend upon correct (recommended) positioning of the unit and the truck hopper acceptance of the aggregate feed rate and water/cement ratio.